Recently, Shandong Marine Group’s “Lankun 01” 1,500-ton new-generation self-propelled jack-up wind power installation platform successfully completed the navigation test in Qingdao.
Lankun 01 is invested and built by Shandong Lankun Ocean Engineering, a subsidiary of Shandong Ocean Group. The platform measures 135 meters in overall length, 50 meters in width, 10 meters in depth and 8kn in design speed. The transom is equipped with a 1500-ton pile-winding main crane, which can realize 70-meter working depth and 170-meter working height to meet the lifting of 20MW offshore high-power wind turbines.
The lifting capacity, operational depth and overall configuration are all in the leading position, which can meet the lifting operation of large wind turbines in coastal and deep offshore wind farms both in China and abroad in suitable deep waters.
This successful sea trial marks a new achievement of Shandong Ocean Group in promoting green, low-carbon and high-quality development.