Recently, with the successful delivery of the CSB1287# SCR system for Guangzhou Shipbuilding International, the total output of CSSC Engine’s (CSE) HPSCR system has exceeded 400 units, marking a new breakthrough in the field of marine environmental protection power manufacturing.
Since taking over the SCR production in 2018, CSE has continued to optimize the production process and achieved standardization, modularization, refinement and batch construction through process innovation and resource integration.CSE increased the monthly production capacity of SCR from 8 units to 22 units, and the year-on-year delivery volume increased by more than 160%.
Its product repair rate has been reduced from 5.6% in 2024 to 0.5%. The first-time pass rate of welds has increased to 98.7%, and the efficiency has increased by 3 times. The HPSCR system delivery pass rate has increased by 4.2 percentage points from the same period last year to 99.4%, and the customer complaint rate has decreased by 42% year-on-year, achieving a double leap in quality and production capacity. The brand awareness and influence of CSE-HPSCR continues to increase.