Jiangsu Maritime Authority announced that recently, the new-generation mobile offshore platform “Yihai No. 1,” manufactured by Jiangsu Dayang Offshore Equipment Co.,Ltd (DYOE), safely departed from the port and headed to the designated waters in the East China Sea for trial operations.
It is reported that the platform was outfitted at the pier of Tongzhou Bay Qinshi Jiamei Energy Technology (Nantong) with a length of 123.95 meters, a width of 48 meters, a depth of 9.5 meters and a draft of 6.0 meters, which is a new generation of offshore mobile platform.
At the same time, the platform is equipped with a fully rotating propeller electric propulsion system, and its lifting capacity, operating depth, and various configurations are all at the leading domestic level, making it suitable for deep-sea wind farm development operations. After the platform is put into operation, it will actively serve the construction of offshore new energy and make new contributions to achieving the national “dual carbon” strategy.