On January 6, CSSC Engine Co., Ltd. (CSE) successfully delivered the 6S60ME-C10.5-GI+EcoEGR main engine to Guangzhou Shipbuilding International (GSI) at the headquarter.
It is understood that the main engine is the seventh of the 6S60ME-C10.5 dual-fuel type series of main engines built by CSE for GSI.